Progress of work on the construction site of the Plac Zamkowy – Business with Heritage

Plac Zamkowy – Business with Heritage office building is currently at the stage of the facade, installation and finishing works.

On the construction site works are being conducted at the assembly of sidings, windows and the stone elevation on the level of the ground floor of the building. Moreover windows are being assembled in the roof. After assembly and glazing of roof windows and dormers, final flashings will be performed. Currently, parking platforms are being installed in the underground parking.

Also general construction and installation works in the field of plumbing, ventilation, heating and cooling are being performed. Additionally high voltage power lines in technical rooms in the basement of the building and low voltage power lines are being implemented on the common and lease areas of the building.